![Bridge beams transport by truck-2](https://www.thegtigroup.com/hs-fs/hubfs/Imported_Blog_Media/Bridge%20beams%20transport%20by%20truck-2.jpg?width=288&height=166&name=Bridge%20beams%20transport%20by%20truck-2.jpg)
We moved oversize bridge beams from Quebec, QC. to the Phelpston, ON. for the Vigo Project.
Here is the equipment we used for the 7 loads:
- 1 x 3 axel flatbed load – 58000 lbs
- 4 x 53’ expendable flatbed loads measuring 104’ long – 58000 each load
- 2 x 53’ extendable flatbed load measuring 86’ long – 51000 each load
#whatittakes
![bridge beams](https://www.thegtigroup.com/hs-fs/hubfs/Gti%20December2020/Images/bridge%20beams.jpg?width=288&height=216&name=bridge%20beams.jpg)